Example WBS for Development Project |
| Task 1: Analyze Requirements |
| |
| |
Subtask 1.1 Design Data Collection Instrument and Analysis Procedures |
| |
Subtask 1.2 Analyze Files, Reports, and Documents |
| |
Subtask 1.3 Interview/Survey Interested Parties |
| |
Subtask 1.4 Identify and Document Requirements |
| |
Subtask 1.5 Meet with and Report Results to Customer |
| |
| Task 2: Design System/Procedure/Product |
| |
| |
Subtask 2.1 Develop Overall Structure and Conceptual Level Design |
| |
Subtask 2.2 Design Detailed Procedure/Computer Modules |
| |
Subtask 2.3 Document Functions/Features/Benefits |
| |
Subtask 2.4 Develop Measures of Operating Performance |
| |
Subtask 2.5 Present and Publish Results |
| |
| Task 3: Train Users |
| |
| |
Subtask 3.1 Develop Training Media/Material |
| |
Subtask 3.2 Train-the-Trainers |
| |
Subtask 3.3 Conduct Training |
| |
Subtask 3.4 Evaluate and Refine Training |
| |
| Task 4: Test and Refine Systems (Procedure or Product) |
| |
| |
Subtask 4.1 Develop Performance Measures and Test Procedures |
| |
Subtask 4.2 Test Systems (Procedure or Product) |
| |
Subtask 4.3 Refine Systems (Procedure or Product) |
| |
| Task 5: Operate System/Procedure/Product |
| |
| |
| Task 6: Measure Operating Results |
| |